Oak Hill Road, Eastwood Drive to Millersburg Road
The proposed improvements include the relocation of approximately 4,900 feet of water main along Oak Hill Road between Eastwood Drive and Millersburg Road as part of the multiple phase road improvements project by the Vanderburgh County Engineers Office. The project is expected to include new fire hydrants, gate valves and 46 service connections.
Project Team
Project Owner - Evansville Water & Sewer Utility
Evansville, Indiana
​
Program Manager - American Structurepoint, Inc.
Evansville, Indiana
​
Project Designer - United Consulting Engineers
Indianapolis, Indiana
​
Construction Engineering Services - American Structurepoint, Inc.
Evansville, Indiana
​
Contractor- Koberstein Contracting
Evansville, Indiana
​
​
Project Update
-
 Recent Progress (January 5 to January 11)
• Koberstein flushed the new 12” C900 PVC water main on Oak Hill Rd. between Voigt Rd. and 7415 Oak Hill Rd.
​
-
 Anticipated Activities for Upcoming Week (January 12 to January 18)
• Koberstein intends to re-chlorinate the new 12” C900 PVC water main on Oak Hill Rd. between Voigt Rd. and 7415 Oak Hill Rd.
• Koberstein intends to activate the new 12” C900 PVC water main on Oak Hill Rd. between Voigt Rd. and 7415 Oak Hill Rd., pending the results of water quality sampling.
• Koberstein intends to begin connecting the new ¾”-1” water service connections on Oak Hill Rd. between Voigt Rd. and 7415 Oak Hill Rd., pending the results of water quality sampling.
Active and Scheduled Closures
-
Active
-
 Oak Hill Road between Voigt Road and William L. Brooks Drive (Closed, Local Traffic Only)
- ​Please note this is a Vanderburgh County Road reconstruction project including road improvements and utility relocations that are not affiliated with Evansville Water & Sewer Utility.
-
​
Scheduled
-
​No additional closures scheduled in the immediate future. ​
​
​
Project Schedule​
-
Phase 1 (Eastwood to Voigt Rd)
-
​Install water main- Complete
-
Service and tie-in connections - Complete
-
​
-
Phase 2 (Voigt Rd to Millersburg Rd)
-
Install water main - Complete
-
Service and tie-in connections - January 10 to February 18, 2025
-